Designer Thomas Heatherwick has been appointed to design a £150 million, 49 megawatt biomass power plant in Stockton on Tees, north-east England, BD can exclusively reveal.
Designer Thomas Heatherwick has been appointed to design a £150 million, 49 megawatt biomass power plant in Stockton on Tees, north-east England, BD can exclusively reveal.
This entry was posted on November 30, 2009, 9:27 am and is filed under Architecture News. You can follow any responses to this entry through RSS 2.0. You can leave a response, or trackback from your own site.
Fusion theme by digitalnature | powered by WordPress
Entries (RSS) and Comments (RSS) ^